How We Work
Working process
Lift and shift
STEP 1 – FEASIBILITY ASSESSMENT (2 to 3days)
Option 1: Visit us
- Phone Consultation with Üppigo Experts
- Zoning Verification
- Product overview
- Visiting Üppigo Office for face to face discussion
Option 2: Site Visit
Üppigo will review site feasibility and provide you with the following:
- Meeting with Team Üppigo
Site visit by Üppigo Technical consultant and Architect to determine accessibility and site conditions that will help to make a thorough design of your studio unit.- Zoning Verification
- Upgrade Option Pricing
- Budgetary Estimate for site preparation
STEP 2 – DESIGN AND ENGINEERING (3 to 4 days)
Step2.1: Permit Drawings and Basic Foundation Engineering
Üppigo will provide architectural drawings and basic foundation engineering that can be submitted for your permit approvals.
- Architectural Drawing
- Basic Foundation Engineering
Step2.2: Price quotation
Üppigo will provide a price quotation
- Design Briefing and Proposal
- Concept Design
- Architectural Drawing Set
- Custom Foundation Engineering
- Price is quoted per project
STEP 3 – 50% RESERVATION DEPOSIT
Hold your production spot by submitting 50% of quoted price.
STEP 4 – PERMIT SUBMISSION
As you will final the deal with üppigo, üppigo will submit you documents such as
- 3D design
- Material subscription
- Signed deal
- Üppigo will be liable to complete the project as per decided time
STEP 5 – manufacturing period
- Locks in next available production spot
- Site construction usually starts at this time
- 3-6 weeks build time once manufacturing begins (As per the design)
STEP 6 – manufacturing
- Fabrication of your Üppigo begins
- Pictures and updates are sent at each stage of the build
- Completion date will be followed
STEP 7 –FACTORY manufacturing process COMPLETE – 30% PAYMENT TO Üppigo
- Required at the time of final visit when your Üppigo studio unit will be ready
Site visit by Üppigo Manager to ensure access and foundation requirements are met.- If you require any other changes, you can make it at
manufacturing unit of Üppigo.
STEP 8 – INSTALLATION – FINAL 20% (HELD IN TRUST)
- Üppigo unit is sent by truck to your property
- The final price to be paid at the time of transportation.
- Final walkthrough and sign-off with client
Üppigo portable Unit
STEP 1 – FEASIBILITY ASSESSMENT (2 to 3days)
Point 2.1: Visit us
Based on
- Phone Consultation with Üppigo Expert
- Zoning Verification
- Product
over view - Visiting Üppigo Office for face to face discussion
- Discussion
on your requirements
Point 2.2: Site Visit
Üppigo will review site feasibility and provide you with the following:
- Meeting with Üppigo team
- Site visit by Üppigo Technical consultant and Architect to determine accessibility and site conditions that will help to make a thorough design of your studio unit.
- Zoning Verification
- Upgrade Option Pricing
- Budgetary Estimate for site preparation
STEP 2 – DESIGN AND ENGINEERING (3 to 4 days)
Option 1: Permit Drawings and Basic Foundation Engineering
Üppigo will provide architectural drawings and basic foundation engineering that can be submitted for your permit approvals.
- Architectural Drawing
- Basic Foundation Engineering
Option 2: Price quotation
Üppigo will provide a price quotation
- Design Brief and Proposal
- Concept Design
- Architectural Drawing Set
- Custom Foundation Engineering
- Price is quoted per project
STEP 3 – 50% RESERVATION DEPOSIT
Hold your production spot by submitting 50% of quoted price.
STEP 4 – PERMIT SUBMISSION
As you will final the deal with üppigo, üppigo will submit you documents such as
- 3D design
- Material subscription
- Signed deal
- Üppigo will be liable to complete the project as per decided time
STEP 5 – CONSTRUCTION period
- Locks in next available production spot
- Site construction usually starts at this time
- 3-6 weeks build time once manufacturing begins (As per the design)
STEP 6 – PRODUCTION (10-12 WEEKS)
- Fabrication of your Üppigo begins
- Pictures and updates are sent at each stage of the build
- Completion date will be followed
STEP 7 – FACTORY CONSTRUCTION COMPLETE – 30% PAYMENT TO Üppigo
- Required at the time of final visit when your Üppigo studio unit will be ready
Site visit by Üppigo Manager to ensure access and foundation requirements are met.- If you require any other changes, you can make it at
manufacturing unit of Üppigo.
STEP 8 – INSTALLATION – FINAL 20% (HELD IN TRUST)
- Üppigo unit is sent by truck to your property
- Üppigo approved installation contractor to perform
installation on foundation - Final utility connections are completed by
on-site contractor - Landings, decks
and landscaping are completed byon-site contractor. - Final walkthrough and sign-off with client