How We Work

Working process

Lift and shift

STEP 1 – FEASIBILITY ASSESSMENT (2 to 3days)

Option 1: Visit us

  • Phone Consultation with Üppigo Experts
  • Zoning Verification 
  • Product overview
  • Visiting Üppigo Office for face to face discussion

Option 2: Site Visit

Üppigo will review site feasibility and provide you with the following: 

  • Meeting with Team Üppigo
  • Site visit by Üppigo Technical consultant and Architect to determine accessibility and site conditions that will help to make a thorough design of your studio unit.
  • Zoning Verification 
  • Upgrade Option Pricing 
  • Budgetary Estimate for site preparation

STEP 2 – DESIGN AND ENGINEERING (3 to 4 days)

Step2.1: Permit Drawings and Basic Foundation Engineering

Üppigo will provide architectural drawings and basic foundation engineering that can be submitted for your permit approvals.

  • Architectural Drawing
  • Basic Foundation Engineering

Step2.2: Price quotation

Üppigo will provide a price quotation according the designs and facilities you have selected.

  • Design Briefing and Proposal
  • Concept Design
  • Architectural Drawing Set
  • Custom Foundation Engineering
  • Price is quoted per project

STEP 3 – 50% RESERVATION DEPOSIT

Hold your production spot by submitting 50% of quoted price.

    STEP 4 – PERMIT SUBMISSION

    As you will final the deal with üppigo, üppigo will submit you documents such as

    • 3D design
    • Material subscription
    • Signed deal
    • Üppigo will be liable to complete the project as per decided time

      STEP 5 – manufacturing period

      • Locks in next available production spot
      • Site construction usually starts at this time
      • 3-6 weeks build time once manufacturing begins (As per the design)

        STEP 6 – manufacturing

        • Fabrication of your Üppigo begins
        • Pictures and updates are sent at each stage of the build
        • Completion date will be followed

          STEP 7 –FACTORY manufacturing process COMPLETE – 30% PAYMENT TO Üppigo

          • Required at the time of final visit when your Üppigo studio unit will be ready
          • Site visit by Üppigo Manager to ensure access and foundation requirements are met.
          • If you require any other changes, you can make it at manufacturing unit of Üppigo.

            STEP 8 – INSTALLATION – FINAL 20% (HELD IN TRUST)

            • Üppigo unit is sent by truck to your property
            • The final price to be paid at the time of transportation.
            • Final walkthrough and sign-off with client

              Üppigo portable Unit

              STEP 1 – FEASIBILITY ASSESSMENT (2 to 3days)

              Point 2.1:  Visit us

              Based on access information and overhead crane clearance confirmed by the Customer, Üppigo will review site feasibility and provide you with the following:

              • Phone Consultation with Üppigo Expert
              • Zoning Verification 
              • Product over view
              • Visiting Üppigo Office for face to face discussion
              • Discussion on your requirements

              Point 2.2: Site Visit

              Üppigo will review site feasibility and provide you with the following: 

              • Meeting with Üppigo team
              • Site visit by Üppigo Technical consultant and Architect to determine accessibility and site conditions that will help to make a thorough design of your studio unit.
              • Zoning Verification 
              • Upgrade Option Pricing 
              • Budgetary Estimate for site preparation

                STEP 2 – DESIGN AND ENGINEERING (3 to 4 days)

                Option 1: Permit Drawings and Basic Foundation Engineering
                Üppigo will provide architectural drawings and basic foundation engineering that can be submitted for your permit approvals.

                • Architectural Drawing
                • Basic Foundation Engineering

                Option 2: Price quotation
                Üppigo will provide a price quotation according the designs and facilities you have selected.

                • Design Brief and Proposal
                • Concept Design
                • Architectural Drawing Set
                • Custom Foundation Engineering
                • Price is quoted per project

                STEP 3 – 50% RESERVATION DEPOSIT

                Hold your production spot by submitting 50% of quoted price.

                  STEP 4 – PERMIT SUBMISSION

                  As you will final the deal with üppigo, üppigo will submit you documents such as

                  • 3D design
                  • Material subscription
                  • Signed deal
                  • Üppigo will be liable to complete the project as per decided time

                    STEP 5 – CONSTRUCTION period

                    • Locks in next available production spot
                    • Site construction usually starts at this time
                    • 3-6 weeks build time once manufacturing begins (As per the design)

                      STEP 6 – PRODUCTION (10-12 WEEKS)

                      • Fabrication of your Üppigo begins
                      • Pictures and updates are sent at each stage of the build
                      • Completion date will be followed

                        STEP 7 – FACTORY CONSTRUCTION COMPLETE – 30% PAYMENT TO Üppigo

                        • Required at the time of final visit when your Üppigo studio unit will be ready
                        • Site visit by Üppigo Manager to ensure access and foundation requirements are met.
                        • If you require any other changes, you can make it at manufacturing unit of Üppigo.

                          STEP 8 – INSTALLATION – FINAL 20% (HELD IN TRUST)

                          • Üppigo unit is sent by truck to your property
                          • Üppigo approved installation contractor to perform installation on foundation
                          • Final utility connections are completed by on-site contractor 
                          • Landings, decks and landscaping are completed by on-site contractor.
                          • Final walkthrough and sign-off with client

                          Reach Us

                          Feel Free to Contact us, We Happy to Hear you

                          48,Punit Nagar, besides to Times of India office, O.P. Road , Vadodara, 390012

                          +91 8758844376

                          +91 9016816157

                          Ask for Quotation

                          WhatsApp chat